In 2018, it was requested that the energy system of the company's production facility be completely renovated. Based on previous projects implemented in collaboration with ELG-ELECTRIC and CERGOMONT, the GEOVAP company was approached to participate in the creation of the project documentation (together with the TEVA-elektro company) and to be involved in the tender process.

Client
Published October 2, 2024
Category Smart buildings
Tags

 

Control system

The Tecomat Foxtrot system is decentralized and installed in three control cabinets throughout the sports center. One PLC is used for controlling water preparation and two PLCs are used for controlling two air handling units. For data exchange, the PLC devices are interconnected through PLCNet. The main control cabinet is equipped with an HMI panel for local control.

The control system is used to control following technology:

  • ROBUR heat pumps
  • Hot water preparation and distribution
  • Atrea DUPLEX 8000 Roto-N air handling unit (interior)
  • Atrea DUPLEX 4500 MultiEco air handling unit (clubroom, restaurant, fitness center, locker rooms)
  • Lights through DALI ballasts (scenes can be set)
  • Gas, water, and heat consumption (M-Bus communication)

The control PC is located in the reception office. It is equipped with the Reliance SCADA/HMI system. The prime objective of Reliance is to gather data from the PLCs and present it graphically so that the operator is notified immediately of the status of the sports center's technological systems and is able to identify and solve potential problems.

 

All operating data is logged to a database. Energy data logging is also an integral part of the project.

Chcete vědět více?